El-Björn was called upon to provide an off-grid power supply to aid in the construction site of Greatfields School, a project based within the Ultra Low Emission Zone area of London, undertaken by Cedar M&E Ltd. and Auburn Group Ltd.
The Generator would be used to provide temporary power to the project whilst the DNO (District Network Operator) carried out essential rerouting works to the existing Temporary Builders Supply (TBS). Once complete the TBS would be reconnected back to the national grid supply.